HomeNewsPhotos

Photos

New 513th ACG operations facility
Officials from the 513th Air Control Group, Tinker Air Force Base, Air Force Reserve, Fortis Networks, Inc. and the U.S. Army Corps of Engineers gathered to break ground on the new operations facility April 14 during a ceremony in the field east of the 72nd Air Base Wing Headquarters, Bldg. 460. The 32,000 sq. ft. facility will allow the currently physically separated units to have a consolidated Air Control Group Headquarters, Operations Support Flight and Airborne Air Control Squadron facility. The building is scheduled to be completed by January 2018. (U.S. Air Force photo/Maj. Jon Quinlan)

Download Image: Full Size (1.71 MB)
Photo by: Maj. Jon Quinlan |  VIRIN: 160408-F-VM627-204.JPG